link events example

  • A Link is a mechanism for connecting two sections of a Process.
  • Link Events can be used to avoid long Sequence Flow lines.
  • The use of Link Events is limited to a single Process level (i.e., they cannot link a parent Process with a Sub-Process or one pool to another pool).
  • There can be multiple source Link Events, but there can only be one target Link Event.
  • In V5.0, the Name property of the throwing event(s) and the catching event must be identical. For the avoidance of doubt, this is the โ€˜Nameโ€™ field in the diagrammer, not the โ€˜Details - Link Nameโ€™ property, which is currently not used.