You are not looking at the latest version of the documentation. Check it out there.
You are looking at draft pre-release documentation for the next release of Flows for APEX. Product features documented here may not be released or may have different behavior to that documented here.
You should not make any purchase decisions based on this draft documentation..
Link Events
BPMN Link Events
- A Link is a mechanism for connecting two sections of a Process, as a tool for simplifying your process diagrams.
- Link Events can be used to avoid long Sequence Flow lines.
- The use of Link Events is limited to a single Process level (i.e., they cannot link a parent Process with a Sub-Process or one pool to another pool).
- There can be multiple source Link Events, but there can only be one target Link Event.
- In V5.0, the Name property of the throwing event(s) and the catching event must be identical. For the avoidance of doubt, this is the βNameβ field in the diagrammer, not the βDetails - Link Nameβ property, which is currently not used.